top of page

HCT CONTAINER TERMINAL IN THE PORT OF ASHDOD

Quality Control (EPC QC) in the construction of a new automated container terminal (HCT) in the Port of Ashdod.
This multi-disciplinary project includes large scale earthworks, pavement, electrical, drainage and sewage infrastructures, container stocking areas, fully automated yard with stacking cranes, electrical buildings, office building, maintenance buildings, extensive electrical equipment, on dock rail facility

Area: 630,000 sq.m.

Port capacity: 2.16M TEU's.

Budget: 300M $.

© 2023 Advance Engineering Ltd. All Rights Reserved.

  • Whatsapp
  • Facebook Social Icon
  • LinkedIn Social Icon
  • Instagram
  • YouTube Social  Icon
bottom of page