OFF-SHORE PIPELINES IN ASHDOD

Multidisciplinary Quality Assurance in large infrastructure project of installing off-shore HDPE pipelines diameter 2100mm, total length of 5,000 meters, carried out in Cyprus
and Israel.


Project included dredging trench in seabed, fabrication of pipes in Norway, transport to port of Limassol, connecting pipe segments and flanges, fabrication and installation of concrete collars, transport to Ashdod, laying pipes in excavated trench in depth of 28 meters under sea level, and percise positioning using GPS. Additional works that were carried out included installation of intake heads and diffuser, scour protection, backfill, and installation of buoys.