5th WATER SUPPLY SYSTEM TO JERUSALEM

Quality Control & Quality Assurance (EPC QA&QC) in “5th Water Supply System to Jerusalem” project.


Project includes intermediate pumping stations and 40 km long drinking water pipeline leads from the seawater desalination plants on the Mediterranean coast to the city of Jerusalem, which climbs 540 meters up from Ashdod to Ein Karem, and designed for a throughput of 65,000 m3 of water per hour. The project also includes Israel’s longest tunnel is a part of the project - 13 km long tunnel done by TBM, diameter is 3.9m, and also fabrication and welding steel pipes ID 2.60m laid inside the tunnel, and concreting the remaining gap.

Client: Strabag

Budget: 520M €